City of Minnetonka Pilots Pipe Assessment Prior to Road Resurfacing

Date:

10/01/2024

Publication:

The City of Minnetonka (City) is a suburb of Minneapolis/Saint Paul Metro area on the shores of Lake Minnetonka. Their water network services 2 - 2.4 billion gallons of water per year to over 50,000 residents. The water system includes eight water treatment plants, approximately 3,100 fire hydrants, 300 miles of water main, 16,000 service connections, eight elevated storage facilities and one reservoir. An estimated 80% of their water pipe network was installed during significant municipal expansions in the 1950-60’s and consequently are approaching the end of their design life within the next 20 years.

In 2022, Hennepin County contacted the City to start planning the rehabilitation of two miles of County Road 3 (Excelsior Boulevard) in the next 5 years. Excelsior Boulevard serves as the corridor for a critical 18-inch ductile iron trunk water main that runs between two water treatment plants and is adjacent to one of the city’s elevated storage tanks. The main was originally installed in phases from 1968-73 and has had four failures in the past five years. The County has a five-year excavation moratorium following rehabilitation of a roadway surface, and an expectation that no significant utility work is to be performed for 20 years following a resurfacing project.

The City was faced with a decision to either rehabilitate or replace two miles of 18-inch water main now or delay the work for 20 years. There is significant cost involved with replacing water mains this large, so the City wanted to know if it was possible to defer that spending. Excelsior Boulevard is a heavily trafficked roadway, and the work would also require traffic control.

To gather critical data on the condition of the water main, the City sought out condition assessment solutions and contracted SEH, Inc., a local civil engineering firm. Dave Hutton Senior Project Manager at SEH, said “We have developed a strong partnership with Echologics using their ePulse technology to asses the condition of pipe mains, and assist municipalities in planning and budgeting their water main rehabilitation projects. The City of Minnetonka project is a great example of this as they were attempting to plan future watermain needs ahead of the County Road reconstruction project.”

SEH and Echologics have inspected over 50 miles of water main within the state of Minnesota over the years, providing a proven method of inspection to utilities.

The ePulse technology combines acoustic data measured in the field with information about a pipe’s manufacturing to determine its current average remaining pipe wall thickness of a watermain with no interruption to service, costly excavations, or extensive support from utility crews. The percentage of thickness loss is calculated by comparing the measured thickness to the design thickness to provide a quantitative coupled with a qualitative condition (good, moderate, poor) and helpful context to the ePulse measurement.

“The Echologics [ePulse] solution was chosen because it is non-invasive, easy to use and does not require entering the pipe or affecting the flow of water to customers,” said Mike Kuno, Utility Operations Engineer from the City.

A total of 12,500 feet of water main was tested in July 2023 to identify areas of concern to support the City’s decision to leave, rehabilitate or replace in whole or part under County Road 3 and Excelsior Boulevard. The decision would consider the 5- and 20-year moratoriums along with the current condition of the main from the assessment to identify any rehabilitation work required ahead of or in conjunction with the County Road project.

The primary objectives of the pipe condition assessment program were to:

  • Determine the condition of the water mains by measuring the remaining structural thickness of the pipes and percentage loss to-date.
  • Investigate the pipe for the existence of any leaks.
  • Utilize pipe condition information to assist with rehabilitation or replacement decisions by the City.

Once the maps were reviewed and the project scoped, Echologics’ field personnel completed the survey in three days. The entire process took about 2 months overall. The results, as presented in the table below, show that 13 out of 30 segments tested (44% of total number segments) appeared to be in good condition with less than 10% loss in wall thickness. There were fourteen segments (47% of total number of segments) that appeared to be in moderate condition with wall thickness loss of 10% to 30% from nominal. Zero segments appeared to be in poor condition with more than 30% loss in wall thickness. Three segments yielded no results (NR) due to poor sound propagation along the segment. This may be due to undocumented PVC repairs or repairs using different material to the pipe segment specs or inadequate distance for accurate recording of the time delay.

Segment

Street Name

Sensor 1 Location

Sensor 2 Location

Segment Length (ft)

Pipe Material

Internal Diameter (in)

Equivalent Thickness (in)

Remaining Thickness (in)

% Change from Nominal

230751A001

Excelsior Blvd

1117

1814

326

DIP

24

0.46

0.35

-24

230751A002

Excelsior Blvd

1429

1117

481

DIP

24

0.46

NR

NR

230751A004

Excelsior Blvd

6373

1429

232

DIP

18

0.43

0.34

-21

230751A005

Excelsior Blvd

3952

6373

309

DIP

18

0.43

0.36

-16

230751A006

Excelsior Blvd

3952

0774

434

DIP

18

0.43

0.37

-14

230751A007

Excelsior Blvd

7959

0774

331

DIP

18

0.43

NR

NR

230751A008

Excelsior Blvd

7959

7016

309

DIP

18

0.43

NR

NR

230751A009

Excelsior Blvd

2418

7016

435

DIP

18

0.43

0.38

-12

230751A010

Excelsior Blvd

2418

1123

245

DIP

18

0.43

0.37

-14

230751A011

Excelsior Blvd

5529

1123

611

DIP

18

0.43

0.38

-12

230751A012

Excelsior Blvd

5529

2419

527

DIP

18

0.43

0.43

0

230751A013

Excelsior Blvd

2148

2419

567

DIP

18

0.43

0.43

0

230751A014

Excelsior Blvd

2148

1494

403

DIP

18

0.43

0.41

-5

230751A015

Excelsior Blvd

3671

1494

630

DIP

18

0.43

0.44

0

230751A019

Excelsior Blvd

3749

6114

386

DIP

18

0.43

0.41

-5

230751A020

Excelsior Blvd

6114

1454

493

DIP

18

0.43

0.42

-2

230751A021

Excelsior Blvd

6190

1454

511

DIP

18

0.43

0.38

-12

230751A022

Excelsior Blvd

6190

2455

553

DIP

18

0.43

0.40

-7

230751A026

Excelsior Blvd

5224

6280

397

DIP

18

0.43

0.43

0

230751A027

Excelsior Blvd

5224

4914

412

DIP

18

0.43

0.40

-7

230751A029

Excelsior Blvd

2982

2455

523

DIP

18

0.43

0.40

-7

230751A030

Excelsior Blvd

2982

1959

536

DIP

18

0.43

0.38

-12

230751A031

Excelsior Blvd

3671

PH74-1

617

DIP

18

0.43

0.34

-21

230751A032

Excelsior Blvd

0814

PH74-1

459

DIP

18

0.43

0.43

0

230751A033

Excelsior Blvd

0814

PH104-1

351

DIP

18

0.43

0.31

-28

230751A034

Excelsior Blvd

5087

PH104-1

549

DIP

18

0.43

0.37

-14

230751A035

Excelsior Blvd

6033

4914

399

DIP

18

0.43

0.33

-23

230751A036

Excelsior Blvd

6033

6489

322

DIP

18

0.43

0.36

-16

For pipes that are in good condition checking back in 10 years is standard, depending on the consequence of failure. This allows for measurement of the rate of change of condition with time, which can help with asset management and long-term budget planning.

The best practice for water mains in moderate condition is to install permanent monitoring systems, depending on the consequence of failure, to receive immediate notification of pressure transients and/or leaks. Otherwise conducting field investigations on moderate condition mains should be done in 5 years’ time, to measure the rate of decay and update the condition of the mains. Moderate condition pipes may show a reduced capacity to withstand loading conditions, especially on pipes that are approaching 30% loss in wall thickness.

The City recognized that if a reassessment in 5 or 10 years identified pipes currently in moderate condition to be in poor condition at that time, they would still be subject to the moratorium imposed by the county. As such, the City leveraged the current condition assessment data outlined above, coupled with an analysis of extrapolated degradation over the next 20 years to identify the expected condition of various segments of the main at the end of the moratoriums. The current and extrapolated condition data were critical to the City’s renewal decisions for segments across the length of the main assessed.

“We are pleased to have definitive numbers on the condition of these pipes and very happy to know there are no leaks,” said Kuno. “We can now take this data and make better, more confident decisions regarding main renewals, allow some water mains to remain in service longer and tailor renewal projects and methods to better match the actual pipe condition.”